Project Overview
Lumen Fit-Out delivered the electrical installation for a secondary champagne bar within Fortnum & Mason’s luxury airside dining and drinking venue at Heathrow Airport Terminal 5.
With the bar assembled off-site before being transported to the airport, the project required careful planning to maximise the work that could be completed in advance. Lumen Fit-Out integrated as much of the lighting installation as possible during the off-site assembly, reducing the electrical work required once the bar arrived on site.
Installation at Heathrow brought an additional layer of complexity. Working within an operational international airport meant navigating specialist permits, security passes and mandatory airport inductions, with all on-site works restricted to night-time working windows.
Through extensive preparation and off-site integration, Lumen Fit-Out supported a demanding two-week on-site installation programme.
Electrical Scope
● Full lighting installation.
● Small power installation.
● Off-site integration of lighting within the bar structure.